In Production Process Planning 2.9 you can:
Compare operation property changes made in the product bill of process (BOP) and propagate them to the plant BOP.
Set one variant formula or condition for multiple operations in the same station, simultaneously.
When an operation is in the plant BOP, find it in the product BOP to determine if the operation is allocated elsewhere.
Assign a work area from the BOE to a process line, process station, or process area in a plant BOP.
Assign a part or assembly from the scope of the entire manufacturing bill of materials (MBOM) to an operation in the plant BOP.
Determine part and assembly consumption from the MBOM to an operation in the plant BOP.