Partial mismatch warning

The In-scope partial match and Out-of-scope partial match warnings highlight the following scenario:

  1. Your administrator sets up the dataset you want Production Process Planning to watch using the EP_ProductBopPlantBopAccountabilityCheckDataset preference.

    This preference has no default value.

  2. On the Line Balancing tab, navigate to Line 1.

  3. Click Show Product BOP.

  4. In the Product BOP toolbar, click Show indication information .

  5. Assign an operation to a station in Line 1.

  6. Change some of the watched operation properties in either the product BOP or plant BOP.

    Tip:

    Operations are considered a partial match if the item ID is the same between both structures, but, one of the structures has a different item revision, specified dataset, or occurrence notes.

    The In scope partial match warning is shown next to the operation in the product BOP and plant BOP.

  7. On the Line Balancing tab, navigate to Line 2.

    The Out of scope partial match warning is shown next to the operation in the product BOP.

  8. Click Show Product BOP.

  9. In the Product BOP toolbar, click Show indication information .