Assign product to an operation
During process planning, you must assign the parts and assemblies produced by an operation. You assign the items to the operation in a plant bill of process (BOP) structure.
Navigate to a process area or process line that contains process stations.
Open a process station.
On the Parts subtab, navigate to display the product parts and assemblies you want to assign.
On the Operations table, select the target operation.
To assign a part or assembly to the operation, select and drag the items from the Parts subtab to the Consumed Parts tab of the selected operation.
(Optional) To remove a part or assembly from an operation, select the item in the Consumed Parts tab, and click Unassign .